<< Click to Display Table of Contents >> Navigation: Configuration/Administration > Risk Assessment > Operations |
All Operations are arbitrary. For adding an operation use “New”. For each operation, a type and a group has to be given. In addition, Operations code, can be added. The operations can be linked to components (TAB Assigned to Components) and to Job Codes (Tab Assigned to Job Codes). You can assign more than one job code and more than one component and both too. With “edit” changes can be made. Only operations which are not in use can be deleted. All other operations will be set as inactive with “Set as inactive” and can be activated with “Set as active”. Only one of these buttons will be visible in order of the status. The operations can be printed and saved with “Share”.